0 items
- Description
CYB 405 Wk 5 Discussion – POA&M
Post a total of 3 substantive responses over 2 separate days for full participation. This includes your initial post and 2 replies to other students. If postings only occur on 1 day instead of the required 2, the overall grade of the postings will be reduced by 5 points or 50% of the grade, whichever is less.
DQ Response Due Thursday(20 points) (2 Point late penalty applies for late submission.)
Respond to the following in a minimum of 175 words (Points may be deducted for short responses):
- A plan of action and milestones (POA&M) is a living, historical document that identifies tasks that need to be created to remediate security vulnerabilities. The goal of a POA&M should be to reduce the risk of the vulnerability identified.
- Describe some of the common challenges with developing and maintaining a POA&M from the standpoint of a CISO versus a CIO.
Replies Due Monday (10 points each) (Not accepted late – postings after the week ends do not count toward the score.)
Due Day 7
Post 2 replies to classmates or your faculty member. Be constructive and professional.