IT 210 Week 4 Currency Conversion design (final project draft part 2)

0 items
IT 210 Week 4 Currency Conversion design (final project draft part 2)
IT 210 Week 4 Currency Conversion design (final project draft part 2)
$8.99
  • Description

IT 210 Week 4 Currency Conversion design (final project draft part 2)

Resources: Appendix H and Appendix I

This Checkpoint has three parts:

  1. Complete the hierarchy chart in Appendix H.
  2. Complete the flowcharts in Appendix I based on the Currency Conversion project requirements identified in Appendix A.  Please ensure that you fill in each box that says “Add text here”.
  3. Develop the pseudocode for the program.  The pseudocode should have a Main Module and four subordinate modules.  [Hint: pay particular attention to Appendix I as it contains the flowcharts for the Main Module (called Main Control) and the four submodules].

Post Appendices H, I, and the pseudocode as attachments in the Assignments link.