0 items
IT 210 Week 4 Currency Conversion design (final project draft part 2)
$8.99
- Description
IT 210 Week 4 Currency Conversion design (final project draft part 2)
Resources: Appendix H and Appendix I
This Checkpoint has three parts:
- Complete the hierarchy chart in Appendix H.
- Complete the flowcharts in Appendix I based on the Currency Conversion project requirements identified in Appendix A. Please ensure that you fill in each box that says “Add text here”.
- Develop the pseudocode for the program. The pseudocode should have a Main Module and four subordinate modules. [Hint: pay particular attention to Appendix I as it contains the flowcharts for the Main Module (called Main Control) and the four submodules].
Post Appendices H, I, and the pseudocode as attachments in the Assignments link.