Prepare for the open book quiz to be distributed during class. It will cover all weeks. The “A” quiz is assigned to Team 1 members Emilio, Robert, and Michael. the “B” quiz to Team 2 members Jose, Corey, Adam and Rodolfo.
Post your completed quiz back to this folder with your name in the filename.
CMGT/410 Final Quiz
Name______________________ Date__________
Question Answer
1 . The three sides of the scope triangle or triple constraint are ____________, ________
_______________, and __________________.
2 . The project _____________ defines the boundaries of a project. ________
3 . Personnel in a _________________ organization often report to two or more ________
bosses.
4 . Which of the following has as its main purpose the control of a project’s scope? ________
- A) Process Management
- B) Configuration Management
- C) Change Managementt
- D) None of the above
5 . Which of the following is the name of a popular certification from the Project ________
Management Institute (PMI)?
A)Project Management Professional (PMP®)
B)Project Management Expert (PME)
C)Project Management Mentor (PMM)
D)All of the above
6 . The length of time a task will take is called the __________. ________
A)length
B)duration
C)scope
D)all of the above
7 . What constitutes requirements for agile projects? ________
A)The Scrum
B)The backlog
C)The sprints
D)The requirements list
8 . A is a document that formally recognizes the existence of a project and provides ________
direction on the project’s objectives and management.
A)project charter
B)contract
C)business case
D)project management plan
9 . The problem that is caused by numerous small changes to a project’s scope is ________
sometimes called ______________.
10 . A ____________________ chart is a common tool for showing project ________
activitiy.
11 . A good way to launch a project is with a _____________ meeting. ________
12 . If the actual cost for a WBS item is $1,500 and its earned value is $2,000, what ________
is its cost variance, and is it under or over budget?
A)The cost variance is −$500, which is over budget.
B)The cost variance is −$500, which is under budget.
C)The cost variance is $500, which is over budget.
D)The cost variance is $500, which is under budget.
13 . What technique can you use to resolve resource conflicts by delaying tasks? ________
A)Resource loading
B)Resource leveling
C)Critical path analysis
D)Overallocation
14 . When preparing a budget you should include a(n) ___________ ________
to allow for unforseen events.
- A) Contigency reserve
- B) Overhead factor
- C) Integration allowance
- D) None of the above
15 . Tasks often have a dependency. What kind of task comes before another? ________
- A) Predecessor
- B) Successor
- C) Finish-to-start
- D) Precedent relation
16 . If a programmer is assigned to your project full time (40 hours per week) you ________
could plan on getting at least 8 hours of programming done each day.
- A) True
- B) False
17 . The WBS is developed after the requirements are documented. ________
A)True
B)False
18 . A good way to prevent surprises in a software project is to: ________
- A) Deliver regular releases of the software
- B) Meet reqularly with stakeholders
- C) Set proper expectations in the beginning
- D) All of the above
19 . In _______________ methodologies deliverables are released every two to ________
four weeks.
A)Traditional
B)Evolutionary
C)Static
D)Agile
20 . There are five types of risk response. Which one in the list below is NOT one. ________
A)Accept
B)Acknowledge
C)Avoid
D)Transfer
21 . A risk ____________ is a document that contains results of various risk ________
management processes, and is often displayed in a table or spreadsheet format.
A)management plan
B)register
C)breakdown structure
D)probability/impact matrix
22 . Many experts agree that failure to communicate is the greatest threat to the ________
success of any project.
A)True
B)False
23 . What is the preferred order for performing testing on IT projects? ________
A)Unit, integration, user acceptance, system
B)Unit, system, integration, user acceptance
C)Unit, system, user acceptance, integration
D)Unit, integration, system, user acceptance
24 . __________ is known for his work on quality control in Japan, and he ________
developed the 14 Points for Management in his text Out of the Crisis.
A)Juran
B)Deming
C)Crosby
D)Ishikawa
25 . This type of testing is perform by actual users of the software project, often ________
towards the end of the development cycle.
A)UAT
B)Stress
C)Alpha
D)Security
26 . 1 bonus point. Briefly describe the traditional project lifecycle(s) and explain ________
when you would use it. Use the back of the paper if necessary.
27 . 1 bonus point: Briefly describe the Scrum project life cycle. Use the back of the ________
paper if necessary.