0 items
CPMGT 303 Wk 3 Discussion – Methods for Controlling Project Scope
$3.00
- Description
CPMGT 303 Wk 3 Discussion – Methods for Controlling Project Scope
Post a total of 3 substantive responses over 2 separate days for full participation. This includes your initial post and 2 replies to other students.
Due Thursday
Respond to the following in a minimum of 175 words:
Various processes can be used to monitor and control project scope, schedule and cost.
Discuss a method to monitor or control a project’s scope, schedule, and costs. How do these methods differ for different organizations?
Due Monday
Reply to at least two of your classmates. Be constructive and professional in your responses.