Which phase of the generic development process involves construction and evaluation of multiple preproduction versions of the product?

Multiple Choice

Testing and refinement

Concept development

System-level design

Design detail

Production ramp-up

 

 

The Tuff Wheels was getting ready to start its development project for a new product to be added to their small motorized vehicle line for children. The new product is called the Kiddy Dozer. It will look like a miniature bulldozer, complete with caterpillar tracks and a blade. Tuff Wheels has forecasted the demand and the cost to develop and produce the new Kiddy Dozer. The table below contains the relevant information for this project.

 

 

Development cost   $     1,000,000

Estimated development time       9     months

Pilot testing    $     200,000

Ramp-up cost  $     400,000

Marketing and support cost    $     150,000   per year

Sales and production volume      60,000    per year

Unit production cost      $     100

Unit price       $     170

Interest rate         8     %

________________________________________

 

Tuff Wheels also has provided the project plan shown below. As can be seen in the project plan, the company thinks that the product life will be three years until a new product must be created.

 

Assume all cash flows occur at the end of each period.

 

 

 

 

A process that emphasizes cross-functional integration and concurrent development of a product and its associated processes is known as ___________. (Choose the correct answer to fill in the blank.)

Multiple Choice

cross-functional design

concurrent engineering

integrated process planning

integrated product planning

team planning

 

 

Similarity of projects allows for a streamlined and highly structured development process in which variant of the generic product development process?

Multiple Choice

Technology-push products

Customized products

Complex systems

Quick-build products

Process-intensive products

 

 

Concept development assumes a proven technology in which variant of the generic product development process?

Multiple Choice

Technology-push products

Quick-build products

Complex systems

Platform products

Process-intensive products

 

 

A reason that firms must develop more new products than ever is which of the following?

Multiple Choice

Product life cycles are shorter

Commitments to joint venture partners

They are replacing old customers with new ones

To amortize heavy investments in development labs

The increased difficulty of defending patents and trade names

 

 

Which of the following is primarily used to help design products that will connect product attributes with customer desires?

Multiple Choice

Phase 0: Planning

House of quality matrix

Value analysis/value engineering

Concurrent engineering

System-level design

 

 

Economic analysis of product development projects is useful in which of the following circumstances?

Multiple Choice

Factory location

Distribution decisions

Go/no-go milestones

Demand estimation

Pricing

 

 

Advocates of financial modeling of product design projects argue that:

Multiple Choice

Financial analysis focuses on measurable quantities only.

Financial analysis brings discipline and control to the product development process.

Sufficiently rigorous financial analysis can accurately forecast the product’s profit potential.

Financial analysis is as solid as the assumptions that go into the model.

Financial analysis nurtures innovation and creativity.

 

 

 

Performance measures discussed for development projects does not include

Multiple Choice

Frequency of new product introductions

Yield

Percentage sales coming from very old products

Cost of materials and tooling

conformance – reliability in use

 

 

 

What is it about service processes that makes their design and operation so different from manufacturing processes?

Multiple Choice

Lack of skilled personnel

Poor management

Complexity of the processes

Lack of automated equipment

Direct customer involvement in the process

 

 

 

System integration and validation are an important step in which variant of the generic product development process?

Multiple Choice

Technology-push products

Customized products

Complex systems

Quick-build products

Process-intensive products

 

 

Which of the following is a characteristic of concurrent engineering?

Multiple Choice

Integrated computer-assisted design

Using automated guided vehicles

Separate development teams working at once

Having an excellent forecasting system

The design-build-test cycle

 

 

 

The aim of quality function deployment (QFD) is:

Multiple Choice

To facilitate house of quality analysis

To provide value analysis/value engineering input

To integrate design for manufacturing and assembly (DFMA)

To facilitate better cooperation between business functions

To get the voice of the customer into the design of a product

 

 

Design for manufacturing and assembly delivers product improvements by emphasizing which of the following?

Multiple Choice

Reducing product quality during the assembly process

Simplification of the product by reducing the number of separate parts

Reducing equipment in the production process

Designing products so they can be manufactured by a virtual factory

Designing products that customers will want

 

 

Sensitivity analysis of the base-case financial model is a useful tool for which of the following reasons?

Multiple Choice

To determine how long the development process can profitably last

To understand how many technical people are needed to make the project a success

To help understand the basic trade-offs of resources committed and cash received

To identify the necessary product launch date

To set marketing and sales budgets

 

 

The most basic categories of cash flow for a typical new product do not include:

Multiple Choice

Depreciation

Ramp-up cost

Development cost

Sales revenue

Marketing cost

 

 

What dimension of competitiveness does quality in product design affect?

Multiple Choice

Engineering hours per project

The cost of ongoing service

Responsiveness to customer needs

Aesthetics of design

None of these